SSG21.600 S-221107 beter coverbeeld inplanting

School Sledderlo Genk

With the LO 2020 master plan, the City of Genk wants to create an urban development framework in which the existing hamlets of Sledderlo can flourish in harmony. The long-term vision examines, among other things, the evolution of the existing disjointed residential areas, new residential developments and the dreamed-up school-sports infrastructure, subject of  this submission. In this, soothing strategies are set out for the problems of society and ambitions are put forward for the capacity of the environment and its ecosystems.

New primary school  with sports hall
Proposal, closed competition Open Call
Sledderlo, Genk, Belgium
2021

In collaboration with: Magma Architects
Client:Catholic Primary Education
Sledderlo Genk
Techniques & stability:IRS Engineering Office
Acoustics: Venac Acoustic advice
Landscape: Cluster landscape and urban
planning

SSG21.600 S-230921 schema impact bos
SLD078_web_0
SLD099_web_0
SLD039_web_0
SSG21.500 P-schema inplantingsplan
SSG21.600 S-230921 gevelbeeld

Intersection

The search zone for the project is located in a specific place, on an intersection between 3 conditions: the forest, the neighborhood and the district loop. The strategic location of the school sports building on the edge of the Bospark is a rich motif that should honor the sensitive context. The project seeks connection with the three conditions. It wants to fully experience the forest contexts and unique green environment, give a new face to the Nieuw-Sledderlo district and be a benchmark along the district loop.

LO

The dutch ‘LO’means 'clearing in the woods'. Exactly something we would like to avoid. By imagining the most compact footprint, we notice that a bigger bite is taken out of the woods than when a linear, less compact configuration is implanted. The deforestation is less drastic in this option and the forest can penetrate around, over and into the building. Compact vs. impact.

 

SSG21.600 P-221108 website plan +0
SSG21.500 P-230921 knalbeeld doorsteek
SSG21.600 S-221107 materialenpalet (1310x436)
SSG21.600 S-230921 exploded view

Broad school

Hand in hand with digging out the rich list of requirements, we present a long narrow figure, broad in use and in vision. One building combines the kindergarten, the primary school and the sports hall in a clear gesture. We consider the building as a family of 3 parts, connected by a horizontal play deck. All functions are connected to the environment and to each other. We opt for a very simple and clear organisation. On the left a sports hall, on the right a kindergarten, above a primary school and the central overlap. Due to the central location of the divisible and serving areas, the building can function as a smart machine with or without the school, in the evening or during the day, during the week or at the weekend.

SSG21.600 S-221108 kleuterschool (1310x872)
SSG21.600 S-221108 sporthal (1310x872)
SSG21.600 S-230921 axo patio
SSG21.600 S-221108 interieur gang met patio (1310x872)
Untitled-1
SSG21.600 P-221108 website plan +1
SSG21.500 P-230921 knalbeeld speeldek
SSG21.600 P-221108 website plan +2 +3
SSG21.600 S-230921 lagere school axo